The AI buildout is bottlenecked by energy. But this doesn't mean there is an energy shortage. Instead, the constraint is connecting the flood of new data centers and the plants to power them to the electric grid. Before any new piece of infrastructure can be connected, grid operators must study how it will change power flows around the grid and determine whether upgrades to the system are required. That process is significantly backlogged. Though the median power plant in 2005 waited less than 2...