Tech
Dev Log: 2026-08-12 — a 96s suite that became 42s, a capability that wasn't a scope, and four steps to a passkey
Fifteen commits, three repos, and the bulk of it in one: a control plane that got an MCP surface, a much faster test suite, and a handful of things that turned out to be quietly wrong once I looked properly.
The MCP work has its own write-up — sixty tools, four servers, and a long argument with myself about what a refusal should say. This is everything else.
1. Ninety-six seconds to forty-one
The suite was six minutes on a full run and about 96s in parallel, which is exactly t...
Read the full discussion on Dev.to
This article was aggregated from Dev.to. Click to join the conversation.
View on Dev.to